Hamptons Full House Renovation — Morley

A 1970s Morley owner-occupier that needed everything. Four months. Five rooms. One consistent vision from the front fence to the master suite.

The Brief

The owners had lived in their Morley home for years. It was a solid 1970s brick home — well-built, good bones, decent-sized rooms — but the layout and the finishes belonged to a completely different era. The kitchen was closed off from the rest of the living areas. The bathroom was due for a significant update. The exterior looked tired from the street. And throughout the house, the finishes had accumulated decades of decisions that didn’t quite add up to anything coherent.

The brief was not simply to refresh — it was to genuinely transform. The owners wanted to open up the ground floor layout by removing the wall separating the kitchen from the main living area, creating an open-plan kitchen and living space. They wanted a Hamptons-style kitchen with an island bench. They wanted a master bathroom that felt luxurious rather than functional. They wanted the exterior repainted and the gardens refreshed. And they wanted the laundry — which was barely a room — to become a proper, fitted space.

One agreement. One team. One timeline. Four months to take a good house and turn it into a great one.

Before Photographs

What We Did — Full Scope

Structural & External

  • Structural wall removal — the wall separating the kitchen from the main living and dining area was removed, opening the ground floor into a single connected open-plan space. Structural assessment confirmed wall was non-load-bearing; no beam installation required.
  • Full exterior repaint — cream brick painted white throughout; window surrounds, fascias, and soffits repainted in coordinating tones
  • Window frame replacement — original brown aluminium frames replaced with contemporary dark charcoal/anthracite aluminium frames throughout
  • Roof tile repaint — original terracotta tiles painted dark charcoal to complement the white exterior and new window frames
  • New front landscaping — concrete step pavers through fresh lawn, garden beds with ornamental grasses, Colorbond fencing painted dark to match
  • New driveway and front path — clean concrete finish replacing damaged original surface

Living Room

  • Full strip-out including removal of exposed ductwork, damaged ceiling linings, and all existing floor coverings
  • Herringbone engineered oak timber floor installed throughout living and connecting areas — warm medium-toned oak, laid in 45-degree herringbone pattern
  • Pressed-metal-look ceiling panels — ornate patterned ceiling panels installed, painted white, restoring the character of the original space
  • Existing stacked-stone feature wall retained and cleaned — one of the room’s original character elements, preserved and made a centrepiece of the after result
  • Large picture window — new wide aluminium-framed window replacing original aluminium sliding door configuration, maximising garden views and light
  • Black curtain rod and floor-length charcoal curtains — framing the window without obscuring the view
  • Semi-flush pendant ceiling light — aged cage-style fitting, appropriate to the character of the room
  • LED downlights installed by licensed electrician
  • Full repaint — walls and ceiling in warm white

Kitchen & Open Plan Dining

  • Full strip-out of existing closed kitchen, including all cabinetry, benchtops, appliances, and wall and floor surfaces
  • New kitchen layout designed to take advantage of the open-plan footprint created by the wall removal — island bench as the centrepiece, perimeter cabinetry on two walls
  • White shaker-profile cabinetry throughout — painted MDF, inset shaker door profile, consistent with the Hamptons brief
  • Matt black hardware — cup-pull handles on drawers and doors throughout; consistent with matt black tapware and pendant lights
  • White stone benchtop — island bench and perimeter benchtops in white engineered stone, waterfall edge on island
  • Black steel island bench base — four-legged profile, contrasting with white cabinetry above
  • White subway tile splashback — 75×150mm white ceramic subway tile, white grout, running bond
  • Gas cooktop and under-bench oven — installed and commissioned by licensed plumber and electrician
  • Integrated dishwasher and stainless refrigerator
  • Three glass Edison pendant lights — clear glass with visible filament, black fittings, hung above island
  • New internal window with plant shelf — small window to adjacent space with timber sill, adding light and connection
  • Herringbone engineered oak floor continuing from living area — consistent floor finish through the open-plan space
  • LED downlights and electrical fitoff by licensed electrician
  • Plumbing — sink, dishwasher connections by licensed Perth plumber

Master Bathroom & Walk-In Robe

  • Full strip-out to bare slab — all existing tiles, wall finishes, fixtures, and the wall between bathroom and adjacent robe space removed
  • Wall removed between bathroom and adjacent room to create generous master bathroom footprint, incorporating a walk-in robe within the same expanded space
  • Waterproofing to AS 3740:2021 — full membrane application, inspected and approved before tiling commenced
  • Large-format dark charcoal/slate-look porcelain floor tiles — 600×600mm format, laid throughout bathroom and walk-in robe floor
  • Freestanding white oval bath — focal point of the bathroom, positioned in the centre of the room against the white wall
  • Walk-in shower — white wall panels with recessed herringbone-tiled niche; ceiling-height enclosure; rainfall shower head plus handheld in chrome
  • Dual vanity — two separate vanity units in white shaker-profile cabinetry with chrome cup-pull hardware; white stone benchtop continuous across both units; two undermount basins
  • Wall-mounted chrome tapware — matching profile on both vanity basins
  • Large dark marble-look mirror tiles above vanity — installed in landscape format, spanning both vanity units
  • White toilet suite — close-coupled, contemporary profile
  • Walk-in robe fitout — fully fitted with hanging rails at two heights, open shelving, and white cabinetry integrated into the robe space
  • LED downlights and exhaust fan by licensed electrician
  • Plumbing fit off by licensed Perth plumber — compliance certificate issued

Laundry

  • Full strip-out — aged stainless trough, all wall and floor surfaces, exposed pipe stubs
  • White shaker-profile cabinetry — under-bench cabinet unit with white undermount laundry sink; chrome knob hardware, matching bathroom cabinetry profile
  • White engineered stone benchtop — continuing the white stone palette from kitchen
  • Chrome gooseneck mixer tap
  • White fish-scale/penny mosaic feature tile on rear wall — adds texture and character within the Hamptons palette
  • AEG stacked washer/dryer combination unit — premium integrated appliance, installed in dedicated stacked column recess
  • Existing window retained and refreshed — new frame paint, original proportions preserved
  • Existing window retained and refreshed — new frame paint, original proportions preserved
  • White painted walls above tile line
  • Glass panel exterior door — new door with glass panel, replacing solid original door, maximising light into the laundry
  • LED downlights by licensed electrician

After Photographs

The Challenge

A full house renovation is the most complex project type House & Co manages — not because any single element is uniquely difficult, but because everything is connected. The sequence of trades across five rooms simultaneously, the coordination of materials with different lead times, and the management of a home that is effectively a construction site for four months all require a level of planning that a single-room renovation doesn’t.

The most significant structural decision was the wall removal between the kitchen and the main living and dining areas. Before any design work could be finalised on the kitchen layout, the wall needed to be assessed. A structural engineer confirmed it was non-load-bearing, which meant the removal could proceed without a beam installation — a finding that saved both time and significant cost, and allowed the kitchen design to extend further than originally anticipated.

The bathroom was the other major structural component. The wall between the existing bathroom and the adjacent room was removed to create the expanded master bathroom footprint that now accommodates both the full bathroom and the walk-in robe. This required careful sequencing — the structural work and waterproofing happened before any of the fit-out trades could begin, and the waterproofing inspection was a hard hold point before tiling started.

The property itself was clean. No asbestos was identified in the wall linings or ceiling. No galvanised pipes were found. Electrical was compliant. No lead paint was identified. In a 1970s Morley brick home undergoing a renovation of this scale, a clean bill of health on hidden works is not guaranteed — and it made a material difference to the timeline. Four months from start to finish, on time.

The Result

The photographs tell the story better than words can. But the thing that doesn’t show in a photograph is how the house now feels to move through. Before the renovation, it was a series of separate rooms — kitchen here, dining there, living beyond. After it, those three spaces are one: a continuous open-plan kitchen, dining, and living area that connects through to the garden and reads as a generous, well-proportioned family home.

The Hamptons brief is carried consistently through every room. White shaker cabinetry appears in the kitchen, the bathroom, and the laundry. Matt black hardware in the kitchen, chrome in the bathroom — a deliberate distinction that keeps the kitchen contemporary while the bathroom leans more classic. The herringbone oak floor runs from the front of the house through the kitchen, dining, and into the laundry, creating a visual continuity that makes the house feel larger than its footprint suggests

The exterior transformation is as significant as the interior. The original cream brick, brown frames, and neglected garden gave the house a tired, dated first impression. The same building — same massing, same footprint — now has a completely different street presence. White painted brick, dark charcoal frames, fresh lawn, and clean concrete steppers. The house looks like a decision was made about it. Because it was.

The approximate value uplift following the full renovation: $500,000. For an owner-occupier who also intended to live in the result, the financial return is only part of the picture. The daily quality of a home this well considered is the other part.

Client Review

What the Client Said

Group 20

“We’d lived in the house for years and knew it needed everything. What we didn’t know was how much of a difference the right team makes when you’re doing a job this size. Sam and the House & Co crew managed every trade, kept us informed the whole way through, and delivered exactly what we’d seen in the design. The kitchen opening up to the living room was the best decision we made. The house feels completely different.”

Property owner · Morley · Full House Renovation

Project Details

About Project

Details

Suburb

Morley, WA

Project type

Full House Renovation

Home age & type

Owner-occupier — 1970s, brick veneer

Design style

Hamptons

Rooms renovated

Living room · Kitchen · Master bathroom & WIR · Laundry · Exterior

Key feature

Herringbone engineered oak floor throughout

Structural work

Wall removal (kitchen to living) · Bathroom expansion

On-site duration

4 months

Total timeline

18 weeks including design and trade booking

Asbestos managed

No — none identified

Replumbing

No — existing plumbing compliant

Delivered on schedule

Yes ✓

Compliance certs

Plumbing + Electrical

Related Projects

Full-house
Dianella
Structural skylight - Herringbone floor inside + out - Pool & alfresco

Full House Renovation — Dianella

A large Dianella home with a pool, a generous kitchen, and a project that ran 12 months instead of the planned four — extended entirely by client decision delays, not construction complexity. The result: a structural skylight flooding the living room with light, herringbone timber floor running from kitchen through living to the alfresco deck, two-tone gold-accent kitchen, and a pool area with glass fencing. Approximately $500,000 uplift.
Roof icon
Contemporary
(Owner-occupier — pre-1990, brick)
Vector (32)
12 months
(12 months (extended by client decision delays — not construction complexity))
solar_dollar-outline
~$500,000 value uplift
Asbestos managed: No — clean property
Replumbing: No — existing plumbing compliant
Delivered on schedule: Yes — to fixed scope. Timeline extended by client decision delays
Vector
Electrical + Plumbing
Full-house
Inglewood
Derelict to liveable - 10 skip bins cleared - $500K uplift

Full House Renovation — Inglewood

Card teaser A derelict Inglewood property requiring 10 skip bins of clearance before renovation could begin. Full re-render in white, all terracotta roof tiles replaced with charcoal, carport converted to enclosed garage, contemporary two-tone kitchen, sunroom opened to garden with bifold glass doors. Clean property underneath — $500,000 uplift, delivered on schedule.
Roof icon
Contemporary
(1950s, rendered brick — hipped roofline)
Vector (32)
4 months
(18 weeks including design and booking)
solar_dollar-outline
~$500,000 value uplift
Asbestos managed: No — clean property
Replumbing: No — existing plumbing serviceable
Delivered on schedule: Yes
Vector
Electrical + Plumbing
Multi
Belmont
Galvanised pipes replaced - Multi-room saving - Investment to owner-occupier

Contemporary Bathroom & Laundry Renovation — Belmont

An investment property transformed for the owner to move into. Concrete-look grey porcelain running through both bathroom and laundry — matched palette, matched timeline, one agreement. Galvanised supply lines identified at consultation and replaced as part of the fixed-scope quote — no surprise variation.
Roof icon
Contemporary
(Investment property — pre-1985, double brick)
Vector (32)
6 weeks
(10 weeks including design and booking)
solar_dollar-outline
Available on request
Asbestos managed: No — none identified
Replumbing: Yes — galvanised steel supply lines replaced (both rooms)
Delivered on schedule: Yes