Full House Renovation — Inglewood

Ten skip bins of accumulated decades. A derelict Inglewood home that had been left to deteriorate. Four months to bring it back — and then some.

The Brief

The property at 99a Dundas Street, Inglewood had been left to decline for years. By the time House & Co was engaged, it wasn’t a renovation in the conventional sense — it was closer to a full rescue operation. The house itself was structurally sound, a solid 1950s rendered brick home with a classic hipped terracotta tile roof and good bones underneath the accumulated neglect. But the surface was in a state that required everything to be addressed before anything new could begin.

The brief was straightforward: the owner wanted a home they could actually live in. Not a cosmetic refresh, not a single room update — a complete transformation from a derelict property to a contemporary family home. New kitchen. Updated interior throughout. New exterior finish from front fence to roof. The full picture.

Ten skip bins of old materials, accumulated rubbish, and decades of build-up were removed from the property before renovation work could properly begin. That figure alone — ten full skip bins — gives some sense of the scale of what was there before the first trade arrived.

Before Photographs

What We Did — Full Scope

Site Clearance — Where It Started

  • Full site clearance — ten skip bins of accumulated old materials, rubbish, built-up waste, and derelict fittings removed from the property before structural renovation work could commence
  • Complete strip-out of all interior wall and floor finishes throughout the house — terracotta floor tiles, dated wall linings, ceiling surfaces, and accumulated fittings all removed to allow inspection of the substrate beneath
  • Structural assessment — the rendered brick frame was confirmed as sound throughout. No structural remediation required. The bones of this house were good; it was everything on top of them that had deteriorated.

Exterior Transformation

  • Full re-render of all exterior walls — existing render repaired where deteriorated, new render coat applied throughout, painted in bright white
  • Complete terracotta roof tile replacement — all original terracotta tiles removed (many were broken or cracked), replaced with new dark charcoal concrete tiles throughout the entire roofline
  • Carport conversion to enclosed garage — open carport converted to a fully enclosed garage with new dark Colorbond roller door, creating covered parking and additional security
  • New front entry door — contemporary black panel door with chrome hardware, set into rendered white portico surround; new wall-mounted outdoor pendant lantern either side of entry
  • Full window replacement — all original security mesh windows and frames removed and replaced with contemporary white aluminium-framed windows fitted with white plantation shutters throughout
  • New driveway and front path — exposed aggregate driveway and concrete step pavers through fresh lawn
  • Front garden landscaping — new lawn, garden beds cleared and replanted, potted agaves flanking front entry, white rendered pillar fence
  • White Colorbond fence repainting — side and rear fencing refreshed to coordinate with new exterior palette
  • New exterior lighting — wall-mounted black outdoor lights at entry and along frontage

Interior — Throughout

  • New dark timber-look hybrid floor installed throughout — consistent floor finish running from front entry through sunroom, dining, and kitchen, creating visual continuity across the open plan
  • All walls replastered and repainted throughout in warm white — full interior repaint covering every surface
  • New white panel doors and white architraves and skirtings throughout — all door hardware replaced
  • All exposed brick internal walls (sunroom/dining) painted white — existing brick columns and wall faces cleaned and painted to integrate with the contemporary interior
  • New large bifold/stacking glass doors installed — connecting sunroom dining area to refreshed backyard, maximising indoor-outdoor flow and natural light
  • LED downlights installed throughout by licensed electrician — replacing all existing light fittings
  • Full electrical assessment and upgrade — all circuits checked for compliance; switchboard assessed by licensed electrician; Certificate of Compliance issued

Kitchen

  • Full kitchen strip-out — all existing cabinetry, benchtops, appliances, splashback tiles, and floor finishes removed
  • New custom cabinetry — two-tone treatment: white lower cabinetry and dark charcoal/graphite upper cabinetry, flat-panel profile with chrome bar handles
  • Calacatta marble-look white stone benchtop on island — waterfall edge on island; matching perimeter benchtop
  • Large black undermount double sink — oversized format, black finish, chrome gooseneck mixer tap
  • New black induction cooktop on perimeter bench — replacing original gas cooktop
  • Crystal/glass chandelier over dining area — the same pendant retained from original space, reconditioned and re-hung as a deliberate period reference in the otherwise contemporary interior
  • White walls and LED downlights in kitchen and dining — light-filled, clean, connected to the dining area beyond
  • Plumbing — kitchen sink connections by licensed Perth plumber; Certificate of Compliance issued
  • Electrical — cooktop circuit, lighting, dishwasher connection by licensed electrician

Sunroom & Dining

  • Purple and white painted brick walls — all brick surfaces cleaned, re-rendered where required, and painted white throughout
  • Exposed copper pipes removed from walls — all exposed services rerouted and concealed
  • New bifold/stacking glass doors replacing original aluminium windows — full-height glass opening to backyard garden
  • Dark timber hybrid floor — same floor as kitchen, creating a continuous open-plan surface
  • White panel door and new architraves to corridor — corridor opening framed with new white trim, bookcase artwork niche added
  • Garden beyond doors refreshed — lawn, planting, and white fence creating a green framed view from inside

After Photographs

The Challenge

The central challenge of this project was not any single technical problem — it was the baseline. You cannot begin detailed renovation work on a property that has accumulated decades of neglect until you have cleared the site to the point where you can actually see what you’re working with. Ten skip bins removed before a tile was laid or a wall was painted. That’s the real starting point of this project.

Once the clearance was complete and the structure was assessed, the picture was actually encouraging. The 1950s rendered brick frame was sound throughout. No asbestos was identified in the wall linings or ceiling surfaces. No galvanised supply pipes were found — the plumbing was in serviceable condition. The electrical installation was assessed by the licensed electrician and brought to compliance; a Certificate of Compliance was issued on completion. No lead paint was identified in any tested surface. For a property of this age and condition on the surface, finding a clean structure underneath was a genuinely positive outcome.

The consequence of starting from a completely cleared site was that the four-month timeline had to accommodate both the clearance work and the full renovation programme. Sequencing every trade across a property being renovated entirely — not one room, not two, but every room simultaneously — required careful scheduling. The licensed electrician, plumber, tiler, cabinet maker, painter, and landscaping team were all coordinated under one agreement, with one project manager ensuring each trade arrived in the correct sequence and no work was delayed by a preceding trade not being finished.

The result: four months on site. Delivered on schedule

The Result

The exterior photograph says more than any description can. The same building — same footprint, same hipped roofline, same rendered walls — is unrecognisable. White render instead of deteriorating cream. Dark charcoal roof tiles instead of broken terracotta. An enclosed garage where there was an open carport. Plantation shutters on every window where there was once diamond-mesh security screening. A proper front garden, a formal entry, outdoor lighting. A home that makes a statement from the street rather than one that apologises for itself.

Inside, the sunroom and dining space is the room that shows most clearly what was possible. The before photograph shows purple-painted brick, exposed copper pipes running down the wall, graffiti on a door, terracotta tiles. The after photograph shows the same room — the same proportions, the same brick columns — painted white, with a dark timber floor, a glass bifold wall opening to a green garden beyond, and a dining table set for a family. Same room. Different world.

Inside, the sunroom and dining space is the room that shows most clearly what was possible. The before photograph shows purple-painted brick, exposed copper pipes running down the wall, graffiti on a door, terracotta tiles. The after photograph shows the same room — the same proportions, the same brick columns — painted white, with a dark timber floor, a glass bifold wall opening to a green garden beyond, and a dining table set for a family. Same room. Different world.

Approximate value uplift following the full renovation: $500,000. For a property that was genuinely derelict at the point of engagement, the transformation is not just financial. The owner has a home worth living in. That was the brief. That’s what was delivered.

Client Review

What the Client Said

Group 20

“I bought this property knowing it needed a lot of work. I didn’t fully appreciate how much until House & Co walked through it with me at the consultation. Ten skip bins — I still can’t quite believe that number. But they managed every part of it, kept me informed throughout, and what came out the other end is genuinely a home I’m proud of. The exterior on its own was worth every dollar.”

Property owner · Inglewood · Full House Renovation

Project Details

About Project

Details

Suburb

Inglewood, WA

Project type

Full House Renovation

Home age & type

1950s, rendered brick — hipped roofline

Design style

Contemporary

Rooms renovated

Exterior · Kitchen · Sunroom / Dining · Throughout

Site clearance

10 skip bins of waste removed before renovation began

Key challenge

Derelict property — full clearance required before any renovation could commence

On-site duration

4 months

Total timeline

18 weeks including design and booking

Asbestos managed

No — none identified (clean property)

Replumbing

No — existing plumbing serviceable

Delivered on schedule

Yes ✓

Compliance certs

Electrical + Plumbing

Related Projects

Full-house
Dianella
Structural skylight - Herringbone floor inside + out - Pool & alfresco

Full House Renovation — Dianella

A large Dianella home with a pool, a generous kitchen, and a project that ran 12 months instead of the planned four — extended entirely by client decision delays, not construction complexity. The result: a structural skylight flooding the living room with light, herringbone timber floor running from kitchen through living to the alfresco deck, two-tone gold-accent kitchen, and a pool area with glass fencing. Approximately $500,000 uplift.
Roof icon
Contemporary
(Owner-occupier — pre-1990, brick)
Vector (32)
12 months
(12 months (extended by client decision delays — not construction complexity))
solar_dollar-outline
~$500,000 value uplift
Asbestos managed: No — clean property
Replumbing: No — existing plumbing compliant
Delivered on schedule: Yes — to fixed scope. Timeline extended by client decision delays
Vector
Electrical + Plumbing
Multi
Belmont
Galvanised pipes replaced - Multi-room saving - Investment to owner-occupier

Contemporary Bathroom & Laundry Renovation — Belmont

An investment property transformed for the owner to move into. Concrete-look grey porcelain running through both bathroom and laundry — matched palette, matched timeline, one agreement. Galvanised supply lines identified at consultation and replaced as part of the fixed-scope quote — no surprise variation.
Roof icon
Contemporary
(Investment property — pre-1985, double brick)
Vector (32)
6 weeks
(10 weeks including design and booking)
solar_dollar-outline
Available on request
Asbestos managed: No — none identified
Replumbing: Yes — galvanised steel supply lines replaced (both rooms)
Delivered on schedule: Yes
Vector
Plumbing + Electrical
Full-house
Morley
Full house - Wall removal - Herringbone oak floor

Hamptons Full House Renovation — Morley

A 1970s Morley owner-occupier that needed everything — and got it. Walls removed for open plan, Hamptons kitchen with island bench, master bathroom with freestanding bath and dual vanity, herringbone oak floor throughout, Hamptons laundry, exterior repainted. Clean property, delivered on schedule, approximately $500,000 value uplift.
Roof icon
Hamptons
(Owner-occupier — 1970s, brick veneer)
Vector (32)
4 months
(18 weeks including design and trade booking)
solar_dollar-outline
~$500,000 value uplift
Asbestos managed: No — clean property
Replumbing: No — existing plumbing compliant
Delivered on schedule: Yes